摘要
二次接线是变电站建设施工过程中的重点之一,与整个项目的质量相关联,涉及到变电站电气控制功能的实现。在二次接线施工过程中,涵盖电气设备控制回路的原理正确性,二次接线细节与整个项目的质量相关联,因此,接线前熟悉图纸、熟练标准工艺和每个步骤要求是确保质量的关键。该文着重从变电站二次接线施工过程的标准工艺着手进行论述,以兹借鉴。
Secondary wiring is one of the most important in the process of substation construction,which is related to the quality of the whole project and related to the realization of electrical control function of substation.In the process of secondary wiring construction,it covers the correctness of the principle of electrical equipment control circuit,and the details of secondary wiring are related to the quality of the whole project.Therefore,before wiring should be familiar with the drawings,proficient in the standard process,the requirements of each step is the key to ensure quality.This paper focuses on the standard technology of substation secondary wiring construction process,which can be used for reference.
出处
《科技创新与应用》
2024年第26期177-180,共4页
Technology Innovation and Application
关键词
二次接线
标准工艺
施工质量
变电站
电气控制
secondary wiring
standard process
construction quality
substation
electrical control