摘要
为解决冬季水利工程混凝土施工中的质量控制难题,本文以景电二期泵站改造工程为例,对冬季混凝土施工的质量控制措施进行了深入研究。通过分析冬季施工面临的主要挑战,如低温条件下混凝土强度发展缓慢、施工期间的温度控制和保温难度大、施工材料的适应性和管理难度等,本文提出了一系列有效的技术措施,包括施工前的准备和材料控制、温度控制与保温技术、施工技术的创新与优化、施工后的养护与监控等,旨在提高冬季混凝土施工的质量与效率。
In order to solve the quality control problems in winter water conservancy engineering concrete construction,this article takes the Jingdian Phase II pump station renovation project as an example to conduct in-depth research on the quality control measures of winter concrete construction.By analyzing the main challenges faced by winter construction,such as slow development of concrete strength under low temperature conditions,difficulty in temperature control and insulation during construction,adaptability and management difficulty of construction materials,this article proposes a series of effective technical measures,including pre construction preparation and material control,temperature control and insulation technology,innovation and optimization of construction technology,and post construction maintenance and monitoring,aiming to improve the quality and efficiency of winter concrete construction.
作者
周君丹
Zhou Jundan(Gansu Provincial Water Resources and Hydropower Engineering Bureau Co.,Ltd.,Lanzhou,China)
出处
《科学技术创新》
2024年第20期189-192,共4页
Scientific and Technological Innovation
关键词
水利工程
冬季混凝土施工
质量控制
water conservancy engineering
winter concrete construction
quality control