摘要
以某高校EPC改扩建工程为例,以地质报告和设计图纸为基础,以实现项目土石方含量计量计价为目的,深入分析了施工过程中关于土石方含量的一种新型计算方法,探讨了该方法在实际的现场管理工作中的优势,并针对大土石方量项目采用土质权重占比计算的方法进行详细论述,借助具体项目数据对整个计算过程进行说明。
Taking EPC reconstruction and expansion project of an university as an example,based on geological report and design drawings,with the purpose of realizing the measurement and valuation of soil and rock content of the project,this paper deeply analyzes a new calculation method of earthwork and earthwork content in the construction process,and discusses the advantages of this method in actual site management,and the method of soil weight proportion calculation,and the whole calculation process is explained with specific project data.
作者
吴素惠
陈伊琳
张阳
张浪
许浩杰
WU Su-hui;CHEN Yi-lin;ZHANG Yang;ZHANG Lang;XU Hao-jie(China Construction Second Engineering Bureau Ltd.,Shenzhen 518005,China;Guangdong Machinery Technician College,Guangzhou 510000,China)
出处
《工程建设与设计》
2024年第16期125-127,共3页
Construction & Design for Engineering
关键词
土石方
含量
土质权重占比
计算方法
earthwork and stone work
content
soil weight ratio
calculation method