深圳LNG应急调峰站取水口设计

Design of water intake for Shenzhen LNG emergency peak shaving station
下载PDF
导出
摘要 根据深圳LNG应急调峰站取水口平面布置,结合其使用功能特点和施工过程,取水口结构采用与护岸同步施工。针对取水口结构尺寸大、质量过大、浮运安装比较困难的问题,进行针对性的结构设计,采取“预制浮坞式+现场二次浇筑”方案,并对不同工况下结构内力进行数值分析。结果表明,该方案能满足设计要求,较好地克服施工过程中遇到的困难,并顺利通过交工验收,达到了节约成本和缩短工期的目的。 Based on the layout of the water intake for the Shenzhen LNG emergency peak shaving station,combined with its functional characteristics and construction process,the water intake structure is constructed synchronously with the revetment.In view of challenges of the large size,excessive mass,and difficulty in installation due to floating transportation of the water intake structure,a targeted structural design approach is carried out.The“prefabricated floating dock+on-site secondary pouring”scheme is adopted,and numerical analysis of internal forces under different conditions is carried out.The results show that this scheme meets the design requirements.It effectively overcomes challenges encountered during the construction process and successfully passes the final inspection,achieving the goals of cost savings and shortened construction period.
作者 谢乔木 卢少彦 杨旭 XIE Qiaomu;LU Shaoyan;YANG Xu(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou 510290,China)
出处 《水运工程》 2024年第8期144-151,共8页 Port & Waterway Engineering
关键词 取水口 大型构件 浮运安装 数值分析 water intake large component floating installation numerical analysis
  • 相关文献

参考文献4

二级参考文献6

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部