摘要
电力通信网中关键业务路由配置方法直接对业务传输时延占用率进行计算,未对电力通信网业务需求进行分析,造成方法配置效果差。因此,文章对电力通信网业务需求进行分析,使路由配置更加合理、高效,计算了业务传输时延占用率,并设计电力通信网络路由配置流程实现电力通信网中关键业务路由配置。实验结果表明,该方法降低了不同业务量下业务的危险系数,业务路由配置效果更好。
The key business routing configuration method in the power communication network directly calculates the occupancy rate of business transmission delay without analyzing the business requirements of the power communication network,resulting in poor configuration effectiveness of the method.Research on the configuration method of critical business routing in power communication networks.Analyze the business requirements of the power communication network to make routing configuration more reasonable and efficient,calculate the occupancy rate of business transmission delay,and design the routing configuration process of the power communication network to achieve key business routing configuration in the power communication network.The experimental results show that this research method reduces the risk coefficient of business under different business volumes,and the effectiveness of business routing configuration is better.
作者
李凯
LI Kai(State Grid Jiangsu Electric Power Co.,Ltd.,Lianyungang Power Supply Branch,Lianyungang 222000,China)
出处
《无线互联科技》
2024年第15期36-38,共3页
Wireless Internet Science and Technology
关键词
电力通信网
关键业务路由
配置方法
网络优化
electric power communication network
critical business routing
configuration method
network optimization