三星堆博物馆新馆电气设计以对博物馆展陈最小干预,平衡建筑功能和其他专业需求,兼顾电气装置能源效率为原则,在分析项目前期调研情况和用电需求基础上,从电气机房选址、供配电系统设计、展陈配合、防雷接地系统等方面介绍三星堆博物馆新馆如何根据园区现状、建筑布局、电气系统特点,进行顺势而为的电气设计。
Based on the principle of minimal intervention on the exhibition of museum,balancing building functions and other professional needs and considering the energy efficiency of electrical installation,the electrical design for new building of Sanxingdui Museum is carried out.According to the analysis of the early-stage survey and electricity demand of the project and from the aspects of site selection of electrical machine rooms,power supply and distribution system design,exhibition and presentation cooperation and lightning protection&earthing system,the new building of Sanxingdui Museum is introduced in terms of such characteristics as current park situation,building layout and electrical system,so as to conduct the electrical design following the trend.
作者
李慧
徐建兵
敖发兴
LI Hui;XU Jianbing;AO Faxing(China Southwest Architectural Design and Research Institute Corp.Ltd,Chengdu 610042,China)
出处
《建筑电气》
2024年第8期3-10,共8页
Building Electricity
关键词
三星堆博物馆
顺势而为
变电所
电气机房选址
能源效率
重心法
平均线路长度法
展陈负荷
Sanxingdui Museum
following the trend
substation
site selection of electric machine room
energy efficiency
gravity center method
average line length method