期刊文献+

高速铁路小角度跨越高速公路桥梁方案研究

Research on Scheme of High-speed Railway Bridge SpanningHighway at a Small Angle
下载PDF
导出
摘要 新建广州至汕尾高速铁路跨越深汕西高速公路,高速铁路与高速公路夹角仅为26°。为了确定高速铁路跨越高速公路桥梁的合理设计方案,从功能要求、受力性能、轨道平顺性、经济性能、施工对高速公路的干扰、运营期维养等方面进行综合比选。研究结果表明,主跨160m的拱承斜拉桥为该桥的合理桥式方案。通过结构体系、拱塔轴线线形、拱塔截面型式等方面的研究,确定了拱承斜拉桥的合理结构方案。 Newly-built Guangzhou-Shanweihigh-speedrailway crosses over western section of Shenzhen-Shantou highway.The angle between the high-speedrailway and the highway is only 26°,In order to determine the most reasonable design scheme for high-speed railway bridge Spanning Highway,a comprehensive comparison was made fromfunctional requirements,mechanical performance,track smoothness,cost,interference of construction on the highwayandmaintenance during operation,The research results indicates that the arch-support cable-stayed bridge with a main span of 160m is the reasonable bridge type scheme for the bridge.Reasonable structural scheme for arch supported cable-stayed bridge was determined by research on structural system,arch tower axis alignment,and arch tower section type.
作者 王斌 WANG Bin(China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
出处 《铁路工程技术与经济》 2024年第5期38-42,共5页 Railway Engineering Technology and Economy
基金 国家铁路集团科技研发计划(N2023G040)。
关键词 高速铁路 跨越高速公路 方案比选 拱承斜拉桥 中承式拱桥 结构体系 high-speed railway spanning highway scheme selection arch-support cable-stayed bridge half-through arch bridge structural system
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部