期刊文献+

受拉工况下新型装配式剪力墙抗震模拟分析

Seismic Simulation Analysis of a New Type of Prefabricated Shear Wall under Tensile Conditions
下载PDF
导出
摘要 预制装配式剪力墙结构的冷缝一直是该类结构的薄弱点,对结构抗震性能的影响很大,文章提出了一种新型改进架空连接预制装配式剪力墙结构。为了研究该新型架空连接预制装配式剪力墙结构的抗震性能,设计了5个不同连接方式的模型,用于对比在轴向受拉状况下装配式剪力墙的抗震性能,针对数值模拟结果,分析了不同连接方式试件的滞回曲线、刚度曲线、耗能能力及破坏云图。研究结果表明:预制装配式改进架空连接的剪力墙结构在轴向受拉状况下,内置角钢抗剪连接件能有效地防止冷缝发展成为裂缝,提高了冷缝处的抗剪能力,有效提高了构件的耗能能力,塑性区面积明显增大,抗震性能增加。 Cold joints in prefabricated shear wall structures have always been the weak point of this type of structure,which has a great impact on the seismic performance of the structure,for this reason,the paper proposes a new type of improved overhead connection prefabricated shear wall structure.To study the seismic performance of this new overhead connection prefabricated shear wall structure,five models with different connection modes are designed to compare the seismic performance of the prefabricated shear wall under axial tension conditions,and the hysteresis curve,stiffness curve,energy dissipation capacity,and damage cloud of specimens with different connection modes are analyzed in terms of the numerical simulation results.The results show that when the prefabricated shear wall structure with improved overhead connection is under axial tensile conditions,the built-in angle steel shear-resistant connectors can effectively prevent the cold joints from developing into cracks,improve the shear capacity at the cold joints,effectively improve the energy dissipation capacity of the members,and the area of the plastic zone is obviously increased,and the seismic performance is increased.
作者 叶新宇 陶旋 YE Xinyu;TAO Xuan(College of Civil Engineering,Suzhou University of Science and Technology,Suzhou Jiangsu 215011 China)
出处 《江苏建筑》 2024年第4期34-38,共5页 Jiangsu Construction
基金 国家自然科学基金项目(521478149) 江苏省研究生实践创新计划项目(SJCX22_1584)。
关键词 装配式剪力墙 改进架空连接 角钢抗剪连接件 轴向受拉工况 抗震性能 prefabricated shear walls improved overhead connections angle steel shear connectors axial tensile conditions seismic performance
  • 相关文献

参考文献4

二级参考文献66

  • 1范浩,温四清,董卫国,施刚.基于ABAQUS的混凝土剪力墙滞回性能的模拟[J].建筑结构,2013,43(S2):549-554. 被引量:18
  • 2严薇,曹永红,李国荣.装配式结构体系的发展与建筑工业化[J].重庆建筑大学学报,2004,26(5):131-136. 被引量:172
  • 3孙景江.钢筋混凝土剪力墙非线性分析模型综述分析[J].世界地震工程,1994,10(1):43-46. 被引量:11
  • 4尹之潜,朱玉莲,杨淑文,李树桢,刘岩.高层装配式大板结构模拟地震试验[J].土木工程学报,1996,29(3):57-64. 被引量:18
  • 5Ned M. Cleland. Design for lateral force resistance with precast concrete shear walls [ J ]. PCI Journal, 1997 (5) : 44 -64.
  • 6Pekau 0 A, Zielinski Z A, Lee A W K, et al. Dynamic effects of panel failure in preeast concrete shear walls [ J ]. ACI Structural Journal, 1988,85 (3) : 277 - 285.
  • 7Moehizuki S. Experiment on slip strength of horizontal joint of precast concrete multi story shear walls [ Jl. Eleven world conference on earthquake engineering, 1996,194 : 1 - 8.
  • 8Pekau O A. Influence of vertical joints on the earthquake response of precast panel walls [ J ]. Building and Environment, 1981 , 16 (2) :153 - 162.
  • 9Harry G. Harris, George Jau -jyh Wang. Static and dynamic testing of model precast concrete shearwalls of large panel buildings [ J ]. Special Publication, 1982,3 : 205 - 237.
  • 10Oliva M G, Clough R W, Vekov M, et al. Correlation of analytical and experimental responses of large - panel precast building systems [R]. UCB/ EERC - 83/20,1988.

共引文献193

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部