本文通过对全国首个硼中子俘获治疗(BNCT)项目大体积混凝土施工进行技术总结,提出了大体积混凝土的抗裂水循环两阶段冷却系统和智能温控系统,及一些在高湿天气下大体积混凝土施工的优化控制措施,为今后的大体积混凝土工程施工和相关施工作业人员提供参考。
Through a technical summary of the construction of the first boron neutron capture therapy(BNCT)project for large volume concrete in China,this article proposes a two-stage cooling system and intelligent temperature control system for crack resistance water circulation of large volume concrete,as well as some optimization control measures for large volume concrete construction in high humidity weather,providing reference for future construction of large volume concrete projects and related construction workers.