盖挖逆作法施工的基坑在顶板施工并覆土完成后,需要进行生产性抽水试验,以地铁项目为例,采用降水井内预置的振弦式孔隙水压计的施工工艺,从而换算出坑内降水井水位变化情况,以保证生产性抽水试验的顺利进行。
For the basement excavated by the inverted construction method,after the top slab is completed and the soil is covered,a production water test is required.Using a subway project as an example,the construction process involves placing a piezoelectric porosity water pressure gauge in the well to calculate the water level change in the well,thereby ensuring the successful completion of the production water test.
作者
李果遥
马涛
王静
LI Guoyao;MA Tao;WANG Jing(Shanghai Changkai Geotechnical Engineering Co.Ltd.,Shanghai 200093,China)
出处
《天津建设科技》
2024年第4期26-28,共3页
Tianjin Construction Science and Technology
关键词
盖挖逆作法
抽水试验
基坑降水
振弦式孔隙水压计
地铁
inverted construction method
water test
foundation pit dewatering
piezoelectric porosity water pressure gauge