摘要
基于某国土资源服务综合楼工程,从工艺流程、提升系统设计、工况分析和提升关键工艺等方面介绍了立体桁架整体提升技术,监测数据表明该桁架合龙口间隙、整体桁架变形均满足验收标准要求,保证了工程质量和进度,为工程的顺利竣工打下了坚实基础,相关研究成果对今后类似工程施工可提供参考。
Based on a certain land and resources service comprehensive building project,the three-dimensional truss overall lifting technology is introduced from the aspects of process flow,lifting system design,working condition analysis,and key lifting processes.Monitoring data shows that the gap between the truss joint and the deformation of the overall truss meet the acceptance standard requirements,which ensures the quality and progress of the project and lays a solid foundation for the smooth completion of the project.Relevant research results provide useful references for similar construction projects in the future.
作者
王靖雯
贾凤苏
WANG Jing-wen;JIA Feng-su(Beijing Chengjian Tenth Construction Co.,Ltd.,100029,Beijing,China;China Jingye Engineering Co.,Ltd.,100089,Beijing,China)
出处
《建筑技术》
2024年第18期2180-2182,共3页
Architecture Technology
关键词
钢结构
整体提升技术
立体桁架
steel construction
the overall lifting technology
space truss