摘要 土石坝黏性土填筑施工碾压压实后,需要测定其渗透系数,若采用室内变水头渗透试验很难准确测出现场实际黏土心墙料填筑压实后的渗透系数。介绍了用双环法能准确测定黏土心墙料填筑压实后的渗透系数的基本原理、试验流程和具体操作方法,以及试验时的注意事项,用双环法测定黏土心墙料原位渗透系数的方法在小白杨水库土石坝工程黏性土中的实际应用情况。实践表明:用双环法能准确地测出填筑碾压压实后的黏土心墙料的渗透系数。 The permeability coefficient of clayey soil in earth-rock dam should be measured after compaction construction.It is difficult to accurately measure the permeability coefficient of the actual clay core after filling and compacting if the indoor variable water head permeability test is adopted.This paper introduces the basic principle,test flow and specific operation method,and points to be paid attention and application of the double-loop method to measure permeability coefficient in the clay soil of the earth-rock dam project of Xiaobaiyang Reservoir.The practice shows that the permeability coefficient of the core wall material after filling and compacting can be measured accurately by double-loop method.
作者 王明强 袁淮中 WANG Mingqiang;YUAN Huaizhong(Sinohydro Bureau 5 Co.,LTD.,Chengdu Sichuan 610200;Beifang Investigation,Design and Research Co.,Ltd.,Tianjin 300222)
出处 《四川水力发电》 2024年第S01期91-93,共3页 Sichuan Hydropower
关键词 黏性土 原位渗透试验 双环法 小白杨水库 Clay soil In-situ seepage test Double-loop method Xiaobaiyang Reservoir
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部