摘要 通过高大型进出水口塔混凝土施工测量实践,从施工控制点布设、施工放样方法的确定以及特殊部位的施工监测和形体验收测量,总结了复杂体形混凝土施工测量方法,该测量方法大幅度提高了工作效率且保障了混凝土的整体精度,为大型混凝土测量积累了宝贵经验。 Through the practice of concrete construction measurement for high and large inlet and outlet towers,this paper summarizes the measurement methods for complex concrete construction from the layout of construction control points,determination of construction layout methods,and construction monitoring and shape acceptance measurement for special parts.This measurement method greatly improves work efficiency and ensures the overall accuracy of concrete,accumulating good experience for large-scale concrete measurement.
作者 谢先双 XIE Xianshuang(Sinohydro Bureau 5 Co.,LTD.,Chengdu Sichuan 610066)
出处 《四川水力发电》 2024年第S01期94-98,共5页 Sichuan Hydropower
关键词 进出水口 全站仪 施工测量 形体测量 Inlet and outlet Total station Construction surveying Shape measurement
  • 相关文献

参考文献1

二级参考文献4

  • 1DBJ01-21-95.建筑工程施工测量规程[S].[S].,..
  • 2GBJ301-88.建筑工程质量检验评定标准[S].[S].,..
  • 3GBJ300-88.建筑安装工程质量检验评定统一标准[S].[S].,..
  • 4谢正勇 袁爱兵.全站仪在施工测量中的精度分析[J/OL].,..

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部