基于DBFL-IWHR的洪水流量研究——以金狮子一级水电站为例

Study on Flood Flow Based on DBFL-IWHR——Taking the Jinshizi I Hydropower Station as an Example
下载PDF
导出
摘要 针对金狮子一级水电站的流量计算问题,通过收集和整理地理、气候、水文地质等基础数据,结合河流的流动特性,构建基于溃坝洪水不变水文率洪水流量模型。在汛期,该模型预测的流量为12.3 m^(3)/s,而实际测量结果为12.1 m^(3)/s,差异为0.2 m^(3)/s。尽管模型预测的流量和水位与实际测量结果存在一定的差异,但差异程度较小,说明该洪水流量模型在预测流量和水位方面具有一定的准确性和可靠性。 In response to the flow calculation problem of the Jinshizi I Hydropower Station,a flood flow model based on dam break flood constant hydrological rate is constructed by collecting and organizing basic data such as geography,climate,hydrogeology,and combining with the flow characteristics of rivers.During the flood season,the model predicted a flow of 12.3 m^(3)/s,while the actual measurement was 12.1 m^(3)/s,with a difference of 0.2 m^(3)/s.Although there are certain differences between the predicted flow and water level of the model and the actual measurement results,the degree of difference is small,indicating that the flood flow model has a certain accuracy and reliability in predicting flow and water level.
作者 王晓慧 傅渝然 WANG Xiao-hui;FU Yu-ran(Guiyang Water Resources and Hydropower Survey,Design and Research Institute Co.Ltd.,Guiyang550081,China;Guizhou Water&Power Survey-Design Institute Co.Ltd.,Guiyang 550000,China)
出处 《工程建设与设计》 2024年第17期82-84,共3页 Construction & Design for Engineering
关键词 DBFL-IWHR 洪水流量 水电站 数值差分 糙率 DBFL-IWHR flood flow hydropower stations numerical difference roughness rate
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部