某机场不停航施工组织方案与实践

Non-Stop Construction Organization Plan and Practice for an Airport
下载PDF
导出
摘要 珠海机场改扩建工程(一标段)—航站楼土建工程涉及T1航站楼各种运营单位的管线改迁、明渠改造等工程,以及主楼、西指廊位于机场飞行区停机坪及使用中的停车场区域的施工,属于民用机场不停航施工项目。项目从不停航施工组织策划、施工部署组织措施、技术保证措施到现场管控措施等方面,阐述了不停航施工管理的措施和方法,有效保证了机场净空、机场飞行和人员安全。 The Zhuhai Airport Reconstruction and Expansion Project(Section 1):the civil engineering of the terminal involves the pipeline relocation and open channel renovation of various operating units of T1 terminal,as well as the construction of the main building and the west corridor located on the apron of the airport’s flight area and the parking lot area in use.It belongs to the non-stop construction of civil airports.The project elaborates on the measures and methods of non-stop construction management from the aspects of non-stop construction organization planning,construction deployment organization measures,technical assurance measures to on-site control measures,effectively ensuring the airport clearance,airport flight,and personnel safety.
作者 白玉晶 邱巍 王国庆 邵光强 兰波 BAI Yu-jing;QIU Wei;WANG Guo-qing;SHAO Guang-qiang;LAN Bo(China Construction Second Engineering Bureau Co.Ltd.,Shenzhen 518000,China)
出处 《工程建设与设计》 2024年第17期248-250,共3页 Construction & Design for Engineering
关键词 民用机场 不停航施工 迁改 净空 安全 civil airport construction without suspension of navigation relocation and renovation clearance security
  • 相关文献

参考文献1

二级参考文献3

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部