全国首座跨海高速铁路5G网络规划建设工程

China's First 5G Cross-ocean High Speed Railway
下载PDF
导出
摘要 福厦客专5G网络无线主设备项目在规划建设中面临首座高铁跨海大桥覆盖、首次大型下沉站台覆盖、高速动车通信配套可靠性等技术挑战,通过创新设备安装规范、下沉大层站台设备安装和450km/h高速列车需求的偏置式漏缆固定方案等解决方案,成功克服了技术难题。项目的管理创新与数智化应用提升了施工效率和管理水平,确保了高质量的工程交付。福厦客专的5G网络开通显著提升了专项场景的用户网络使用感知,为未来高铁建设提供了宝贵经验。 Fuxia Passenger Dedicated 5G wireless main equipment project in the planning and construction of the first high-speed cross-sea bridge cover,first large sinking platform,high-speed train communication reliability and other technical challenges,through innovation equipment installation specification,sinking large layer platform equipment installation and 450 km/h high-speed train demand bias leakage cable fixed solution,successfully overcome the technical problems.The management innovation and digital intelligence application of the project improve the construction efficiency and management level,and ensure the high-quality project delivery.The 5G opening of Fuzhou-Xiamen passenger Center has significantly improved the user network use perception in special scenarios and provided valuable experience for the future high-speed railway construction.
作者 朱铭鸿 ZHU Minghong(China Mobile Fujian Co.,Ltd.Quanzhou Branch,Quanzhou 362000,China)
出处 《数字通信世界》 2024年第9期129-132,共4页 Digital Communication World
关键词 福厦客专 跨海大桥 高铁技术 数智化应用 Fuzhou-Xiamen passenger railway sea bridge high-speed rail technology digital intelligence application
  • 相关文献

参考文献3

二级参考文献20

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部