摘要
论文阐述了建筑工程项目绿色施工管理的必要性,以S民族体育文化活动中心为工程概况,提出了建筑工程项目绿色施工现场管理缺陷,给出了建筑工程项目管理中绿色施工现场管理优化措施,采用BIM技术为核心,结合Revit等软件进行三维建模和模拟分析,对施工现场的能源、土地和水资源进行全面优化管理。结果表明,通过BIM技术的精确控制和动态管理,施工现场的能耗降低了22%,年节省能源成本约10万元,土地占用面积减少了10%以上,水资源消耗量降低了15%,污水排放量也大幅减少,助力中国建筑行业实现更高水平的环境与经济效益双赢。
The paper elaborates on the necessity of green construction management in construction projects,taking the S Ethnic Sports and Cultural Activity Center as the engineering overview,proposes the deficiencies in green construction site management in construction projects,and provides optimization measures for green construction site management in construction project management.BIM technology is used as the core,and 3D modeling and simulation analysis are combined with Revit and other software to comprehensively optimize the management of energy,land,and water resources at the construction site.The results show that through precise control and dynamic management of BIM technology,the energy consumption on construction sites has been reduced by 22%,saving about 100000 yuan in energy costs annually,reducing land occupation by more than 10%,reducing water resource consumption by 15%,and significantly reducing sewage discharge,helping the Chinese construction industry achieve a higher level of environmental and economic benefits win-win.
作者
刘忠富
Zhongfu Liu(Central South Survey Design Institute Group Co.,Ltd.,Wuhan,Hubei,430000,China)
出处
《工程设计与施工》
2024年第3期1-3,共3页
Engineering Design and Construction
关键词
建筑工程
绿色施工
技术管理
construction engineering
green construction
technical management