期刊文献+

浅析SMW工法施工中遇到的技术难点处理

Analysis of the Technical Difficulties Encountered in SMW Construction Method
下载PDF
导出
摘要 SMW工法1976年首创于日本,1994年上海市静安寺环球商场的基坑工程是中国首例该工法应用。其具有造价低、对邻近土体扰动小、施工速度快等特点,适用于黏性土、粉土、砂性土等土质的基坑支护。论文基于某施工实例,对SMW工法中易出现的H型钢定位、水泥搅拌桩冷缝处理问题及如何提高质量进行探讨,并给出相关解决措施,为类似工程施工提供经验。论文基于上海市某工程实际案例,通过对该工程实际施工中遇到的H型钢定位插入和水泥搅拌桩冷缝处理问题进行详细阐述分析,并对如何提高SMW工法桩的质量给出相关做法和建议。上述问题作为实际施工中遇到的问题,论文给出了实际解决方案,为其他相类似情况提供参考案例。 The SMW construction method was pioneered in Japan in 1976,and in 1994,the foundation pit project of Shanghai Jing’an Temple Global Shopping Mall was the first application of this construction method in China.It has the characteristics of low cost,small disturbance to the adjacent soil and fast construction speed,and is suitable for the foundation pit support of clay soil,silt soil and sandy soil.Based on a construction example,this paper discusses the positioning of H-type steel,cold joint treatment of cement mixing pile in SMW method and how to improve the quality,and gives relevant solutions to provide experience for similar engineering construction.This paper is based on a practical case of a project in Shanghai,and provides a detailed analysis of the problems encountered in the actual construction of H-shaped steel positioning insertion and cold joint treatment of cement mixing piles,it also provides relevant practices and suggestions on how to improve the quality of SMW construction piles.The above problems,as encountered in actual construction,are presented in this paper as practical solutions,providing reference cases for other similar situations.
作者 李锦江 Jinjiang Li(Shanghai Qianwei Labor Service Co.,Ltd.,Shanghai,201999,China)
出处 《工程设计与施工》 2024年第3期109-111,共3页 Engineering Design and Construction
关键词 SMW工法 水泥土搅拌桩 H型钢 技术难点 SMW construction method cement soil mixing pile H-shaped steel technical difficult
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部