论文以温州瓯江口综合性住宅开发项目为案例,探讨了预制装配构件技术在综合性住宅开发项目中的应用,特别是质量控制及过程管理的重要性。论文详细分析了预制装配构件在质量控制和过程管理中的关键环节,包括生产能力的极限考验、协同深化设计的复杂性、运输及堆放的空间局限、成品保护的重要性以及质量管控的挑战。通过技术创新和管理策略,项目成功克服了施工中的挑战,实现了预制率超过21%的目标。本研究为类似规模的预制构件住宅开发项目提供了实践经验和管理指导,证实了预制装配构件技术在提升建筑效率和质量控制方面的有效性和可行性。总体而言,论文展现了预制装配构件技术在推动建筑行业进步方面的重要价值。
This paper takes the Wenzhou oujiangkou comprehensive residential development project as a case,and discusses the application of prefabricated assembly component technology in the comprehensive residential development project,especially the importance of quality control and process management.This paper analyzes in detail the key links of quality control and process management of prefabricated assembly components,including the limit test of production capacity,the complexity of collaborative deepening design,the space limitation of transportation and stacking,the importance of finished product protection and the challenge of quality control.Through technical innovation and management strategy,the project has successfully overcome the challenges in the construction and achieved the goal of prefabrication rate exceeding 21%.This study provides practical experience and management guidance for prefabricated residential development projects of similar scale,confirming the effectiveness and feasibility of prefabricated component technology in improving building efficiency and quality control.In general,the paper shows the important value of prefabricated assembly component technology in driving the progress of the construction industry.
作者
吴学慧
Xuehui Wu(Shanghai Construction Engineering Group Co.,Ltd.,Shanghai,200080,China)
出处
《工程设计与施工》
2024年第6期108-111,共4页
Engineering Design and Construction
基金
上海市科委资助项目《城市生命线系统抗震韧性分析及应用示范》(项目编号:22dz1201203)。
关键词
预制
质量控制
过程管理
住宅
施工
prefabrication
quality control
process management
residential
construction