摘要
为了分析不同条件下高边墙超大断面地下硼室结构变形及应力响应,文中建立了施工过程中高边墙超大断面地下碉室结构模型,分析了不同围岩等级下6种工法下高边墙超大断面地下碉室结构的应力及变形。结果表明,随着施工步数的不断增加,所有工法下拱顶的沉降量及隆起量均表现为先快速增加后稳定的变化规律,这为高边墙超大断面地下室结构的施工方案优化奠定了基础。
In order to analyze the structural deformation and stress response of large section underground chamber with high side walls under different conditions,the paper establishes the structural model of large section underground chamber with high side walls during construction,and analyzes the stress and deformation analysis of large section underground chamber structure with high side walls under 6 construction meth-ods under different surrounding rock grades.The results show that with the increasing of the number of construction steps,the settlement and uplift of the vault under all construction methods increase rapidly at first and then change steadily.It lays a foundation for the optimization of the construction scheme of the underground chamber structure with high side wall and large section.
作者
朱文青
郑晴晴
王晨阳
湛佳亮
陈升
Zhu Wenqing;Zheng Qingqing;Wang Chenyang;Zhan Jiaiang;Chen Sheng(Shenzhen Longhua District construction Works Department,Shenzhen,Guangdong 518000;The Second Construction Limited Company of China Construction Eighth Engineering Division,Jinan,Shandong 250000;China Construction Eighth Bureau Shenzhen Construction Technology Co.Ltd.,Shenzhen,Guangdong 518000)
关键词
高边墙
地下室结构
超大断面
施工工法
应力应变响应
High side wall
Underground chamber structure
Large section
Construction method
Stress-strain response