混凝土装配式住宅建筑工程的施工技术分析

Construction Technology Analysis of Concrete Prefabricated Residential Building Project
下载PDF
导出
摘要 为进一步提高混凝土装配式建筑建设质量,缩短建设工期,文中以实际工程为研究对象,对混凝土装配式住宅项目的施工关键技术进行深入分析,主要对预制构件的吊装、施工组织优化、施工工序深化设计等内容进行深入研究。结果表明,测算与分析实际吊装时间,有效缩短了标准层工期,节省了工程投资;同时,通过结构力学分析,得出本工程中叠合板支撑体力立杆间距最大值为2.08 m。本研究内容对于后续工程的开展具有一定借鉴意义。 In order to further improve the construction quality of concrete prefabricated buildings and reduce the construction period,this paper takes the actual project as the research object,and makes an in-depth analysis on the key construction technologies of concrete prefabricated residential projects.The paper mainly studies the hoisting of prefabricated components,the optimization of construction organization,and the deepening design of construction process.The research results show that through the calculation and analysis of the actual hoisting time,the construction period of the standard layer is effectively shortened and the project investment is saved.At the same time,through structural me-chanics analysis,it is concluded that the maximum distance between the vertical bars of the composite plate support in this project is 2.08m.The research content of this paper has certain reference significance for the development of subsequent projects.
作者 李刚 Li Gang(Wuhan Jiancheng Engineering Technology Co.Ltd.,Wuhan,Hubei 430040)
出处 《江西建材》 2024年第6期281-283,共3页
关键词 混凝土装配式建筑 吊装技术 叠合板支撑体系 Concrete prefabricated building Hoisting technology Laminated board support system
  • 相关文献

参考文献6

二级参考文献30

  • 1廖坤静,吴展嘉.基于层级分析法的航海人员驾驶疲劳因子分析[J].中国安全科学学报,2007,17(4):56-61. 被引量:9
  • 2肖美英.房屋建筑工程质量问题的成因与对策[J].中外建筑,2007(7):62-64. 被引量:5
  • 3陈昌明,刘志平.建筑工程质量监控与通病防治全书[M].北京:中国建材工业出版社,1998.
  • 4李纪华.我国住宅工业化发展制约因素及对策研究[D].重庆:重庆大学,2012.
  • 5上海市城乡建设与交通委员会上海装配整体式混凝土住宅体系设计规程[S].2010.
  • 6陶帅,张德海,张小莉,等.现代建筑产业的发展及存在的问题[C].第九届沈阳科学学术年会论文集,2012.
  • 7Kwon O S, Park C S, Lim C R. A defect management system for reinforced concrete work utilizing BIM, image-matching and augmented reality[J]. Automation in Construction, 2014 (46) : 74-81.
  • 8Park C S, Lee D Y, Kwon O S, et al. A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template[J]. Automation in Construction, 2013 (33) : 61-71.
  • 9Sara M, Shahi A, Nahangi M, et al. Automating measurement process to improve quality management for piping fabrication[J]. Elsevier, 2015 (3) : 71-80.
  • 10周定洋,王君波.浅谈建筑工程质量管理方法[J].科技资讯,2010,8(6):163-163. 被引量:44

共引文献458

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部