摘要
介绍了聚变堆主机关键系统综合研究设施(CRAFT)中负离子源中性束注入冷却水系统的初步设计以及热工水力分析,采用Flowmaster软件建立热工水力模型,采用PID控制实现精确的温度控制。仿真结果表明,温度、压降和温度控制精度满足供水温度150~200℃/温度精度±0.5℃的运行要求。研究结果将为NNBI冷却水系统热工水力分析和温度控制提供参考。
The preliminary design and thermal-hydraulic analysis of the Negative Neutral Beam Injection(NNBI)cooling water system in the Comprehensive Research Facility for Fusion Technology(CRAFT)is presented.The thermal-hydraulic model is established by Flowmaster software,and the precise temperature control is realized with Proportional-Integral-Differential(PID)control.The simulation results show that the temperature,pressure drop and temperature control accuracy meet the beam source constant temperature water supply system operation requirements that the water temperature is within 150~200℃with the control accuracy of 0.5℃.The results will provide reference for thermal and hydraulic analysis and temperature control of NNBI cooling water system.
作者
夏文颖
杨雷
胡纯栋
郭斌
朱黎黎
李炜葆
XIA Wen-ying;YANG Lei;HU Chun-dong;GUO Bin;ZHU Li-li;LI Wei-bao(Institute of Plasma Physics,Hefei Institutes of Physical Science,Chinese Academy of Sciences,Hefei 230031;University of Science and Technology of China,Hefei 230026)
出处
《核聚变与等离子体物理》
CAS
CSCD
北大核心
2024年第3期297-303,共7页
Nuclear Fusion and Plasma Physics
基金
中国科学院基金(YZJJ2020QN15)
中国科学院青促会项目(2022448)
聚变堆主机关键系统综合研究设施项目(2018-000052-73-01-001228)。
关键词
冷却水系统
工艺设计
瞬态分析
中性束注入
束源
Water cooling system
Process design
Transient analysis
Neutral beam injection
Beam source