摘要 针对田湾核电站1~4号机组反应堆堆顶电缆大修维护仅能通过人力进行拆装且存在所需人力多、耗时长、效率低等问题,为提高设备检修效率,实现设备维护自动化,从实际使用需求出发,通过结构设计、电气设计以及设计计算对堆顶电缆拆装工具进行设计,并在现场验证其高效可用性。 This work focused on overhaul and maintenance of reactor roof cables in Tianwan nuclear plant unit 1-4,which formerly relied fully on manual operation for cable mounting and dismantling and was hence labor and time consuming,and inefficient.In order to improve equipment maintenance efficiency and realize automated maintenance operation,this work made a fruitful effort in designing and implementing a specific tool for mounting and dismantling the roof cables which fully considers practical requirements of overhaul,through structural design,electrical design,calculations,and on-site verification.
作者 徐东 李袁鹏 黄俊朋 冷凌锋 孙勇 陈彦发 陈亮 梅乾轩 XU Dong;LI Yuanpeng;HUANG Junpeng;LENG Lingfeng;SUN Yong;CHEN Yanfa;CHEN Liang;MEI Qianxuan(Jiangsu Nuclear Power Corporation,Lianyungang 222042,China;Lianyungang SCS Robot Technology Co.,Ltd.,Lianyungang 222042,China)
出处 《电工技术》 2024年第14期153-155,共3页 Electric Engineering
关键词 堆顶电缆 拆装工具 设计 reactor roof cable mounting and dismantling tool design
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部