摘要
为准确评价跨江涉水大型建设项目中总承包企业的安全管理水平,采用成熟度模型及模糊层次分析(F-AHP)定量评价方法,参考国内外重大建设项目安全管理的先进做法,确定重大建设项目安全管理要素,建立起7个一级指标、30个二级指标的评价体系,以重庆某跨江特大型悬索桥为研究案例,深入研究其总承包企业对大型建设项目的安全管理能力的成熟度。研究表明,当前阶段其安全管理水平处于管理级,符合现场实际情况,证明具有可行性。此安全管理成熟度评价体系的形成及评价方法的应用,对类似跨江特大型悬索桥或类似跨江涉水重大项目安全管理现状的阶段性评价具有借鉴意义。
To accurately assess the safety management level of general contractors in large-scale cross-river and water-related construction projects,this study adopts a maturity model and a quantitative evaluation method based on Fuzzy Analytic Hierarchy Process(F-AHP).By referring to advanced practices in safety management of major construction projects both domestically and internationally,the key elements of safety management for such projects are identified.An evaluation system comprising seven first-level indicators and 30 second-level indicators is established.Taking a specific case of an extra-large suspension bridge across a river in Chongqing,this study delves into the maturity of safety management capabilities of the general contractor for this large-scale construction project.The research reveals that the current safety management level falls within the"management level"consistent with the actual situation on site,demonstrating its feasibility.The formation of this safety management maturity evaluation system and the application of the evaluation method provide valuable insights for the staged evaluation of safety management status in similar extra-large suspension bridges across rivers or other significant cross-river and water-related projects.
出处
《重庆建筑》
2024年第S01期23-26,共4页
Chongqing Architecture
关键词
安全管理
成熟度模型
跨江特大型悬索桥
模糊层次分析法
Safety Management
Maturity Model
Extra-large Suspension Bridge Across River
Fuzzy Analytic Hierarchy Process(F-AHP)