摘要
某新建人行地通道需要下穿既有房屋基础,需进行基础托换。对此类涉及既有房屋基础的改造工程,首先进行既有房屋的安全性鉴定,再根据鉴定结果以及业主需求进行改造设计,后由施工方按设计图纸进行施工。在施工过程中,采用了自动化监测措施,确保了施工顺利进行。该文介绍了某人行地通道下穿既有房屋基础改造工程过程,为类似工程实践提供一定的建议及借鉴。
A newly constructed pedestrian underpass requires crossing under existing building foundations,necessitating foundation underpinning.For such reconstruction projects involving existing building foundations,the first step is to conduct a safety appraisal of the existing buildings.Based on the appraisal results and the owners'requirements,the reconstruction design is then carried out,followed by construction by the contractor according to the design drawings.During the construction process,automated monitoring measures were employed to ensure the smooth progress of the construction.This paper introduces the process of a pedestrian underpass reconstruction project crossing under existing building foundations,providing suggestions and references for similar engineering practices.
作者
潘廷明
周伟
任毅
曹淑上
李伟
张由
PAN Tingming;ZHOU Wei;REN Yi;CAO Shushang;LI Wei;ZHANG You
出处
《重庆建筑》
2024年第S01期64-66,共3页
Chongqing Architecture
基金
重庆市建设科技计划项目“重庆市城镇自建房安全隐患调查与加固改造成套技术研究”(项目编号:城科字2023第6-1号)。
关键词
下穿基础
基础托换
自动化监测
Crossing under Foundations
Foundation Underpinning
Automated Monitoring