该文以作者参与的大学城复线隧道工程为例,结合施工过程探讨隧道大断面施工中的安全管理要点。通过深入分析隧道大断面施工的特点与难点,系统梳理施工现场的安全风险,提出针对性的安全管理策略,详细阐述安全管理制度、技术措施、应急预案等方面的实施要点,研究认为,隧道大断面施工安全管理需注重事前预防、事中控制、事后总结,方能确保施工安全高效进行。
This paper takes the University Town Double-Track Tunnel Project,in which the authors participated,as an example to discuss the essential points of safety management in large-section tunnel construction,combined with the construction process.By thoroughly analyzing the characteristics and difficulties of largesection tunnel construction,the paper systematically sorts out the safety risks on the construction site,proposes targeted safety management strategies,and elaborates on the implementation points of safety management systems,technical measures,and emergency response plans.The study concludes that the safety management of large-section tunnel construction requires a focus on prevention beforehand,control during,and summary afterward,to ensure safe and efficient construction.
作者
张基伟
陈志龙
李友武
ZHANG Jiwei;CHEN Zhilong;LI Youwu
出处
《重庆建筑》
2024年第S01期99-101,共3页
Chongqing Architecture
关键词
隧道大断面
施工安全
施工管理
Large-section Tunnel
Construction Safety
Construction Management