地下供排水厂投资估算阶段风险控制措施研究

Research on Risk Control Measure in Investment Estimation Stage of Underground Water Supply and Drainage Plant
下载PDF
导出
摘要 地下供排水厂的建设有效缓解了城市地上空间资源紧张的问题,但地下供排水厂投资数额大,在项目初期有效控制地下供排水厂投资估算阶段的风险至关重要。文章以某地下再生水厂工程为例,识别地下供排水厂投资估算阶段的风险,并提出相应控制措施,以供参考。 The construction of underground water supply and drainage plants has eff ectively alleviated the shortage of urban ground space resources.However,the investment amount of underground water supply and drainage plants is large,so it is very important to effectively control the risk in the investment estimation stage of underground water supply and drainage plants at the initial stage of the project.Taking an underground reclaimed water plant project as an example,this paper identifies the risks in the investment estimation stage of underground water supply and drainage plants,and puts forward corresponding control measures for reference.
作者 张俊哲 ZHANG Junzhe(Beijing General Municipal Engineering Design&Research Institute Co.,Ltd.,Beijing 100082,China)
出处 《工程技术研究》 2024年第13期160-162,共3页 Engineering and Technological Research
关键词 地下供排水厂 投资估算 风险控制 underground water supply and drainage plant investment estimation risk control
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部