为解决山地风电工程建设问题,提高施工管理水平,文章以顶董坡风电工程为案例,介绍了工程概况,指出山地风电工程的设计特点和管理重难点,从技术措施、现场施工管理、质量管理、安全管理、成本管理五个方面阐述了山地风电工程建设过程的管理措施。研究表明,从山地风电工程的实际情况出发,明确建设过程重难点并制订完善可行的管理方案,能提高风电工程的建设效率和质量,实现综合效益的最大化。
In order to solve the problem of mountain wind power engineering construction and improve the level of construction management,this paper takes Dingdongpo wind power engineering as an example,introduces the general situation of the engineering,points out the design characteristics and management difficulties of mountain wind power engineering,and expounds the management measures of mountain wind power engineering construction process fromfive aspects:technical measures,on-site construction management,quality management,safety management and cost management.The research shows that clarifying the key and difficult points of the construction process and formulating a sound and feasible management plan from the actual situation of mountain wind power engineering can improve the construction efficiency and quality of wind power engineering and maximize the comprehensive benefits.
作者
庞远江
PANG Yuanjiang(POWERCHINA Guiyang Engineering Corporation Limited,Guiyang 550081,Guizhou,China)
出处
《工程技术研究》
2024年第14期145-147,共3页
Engineering and Technological Research
关键词
山地风电工程
施工建设管理
成本管理
安全管理
mountain wind power engineering
construc-tion management
cost management