盾构隧道进出洞地基加固处理工艺研究

Research on Foundation Reinforcement Treatment Process for Shield Tunnel Entrance and Exit
下载PDF
导出
摘要 盾构法施工过程中,进出洞一直是一个工程难题。在此过程中,必须保证洞口土的稳定性,以及周边建筑的安全。文章以某河底公路隧道工程为例,从洞口地基加固和盾构进洞两大方面,就盾构隧道进出洞地基加固处理工艺展开详细研究,进行施工效果分析,研究成果可为类似工程提供参考。 In the process of shield construction,the entry and exit of the tunnel has always been an engineering problem.In this process,the stability of the soil at the portal and the safety of the surrounding buildings must be guaranteed.Taking a river bottom highway tunnel project as an example,this paper makes a detailed study on the foundation reinforcement treatment process of shield tunnel entrance and exit from two aspects of portal foundation reinforcement and shield entry.Finally,the construction effect is analyzed.The research results can provide reference for similar engineering.
作者 代志超 DAI Zhichao(China Road&Bridge Corporation,Beijing 100011,China)
出处 《工程技术研究》 2024年第14期157-159,共3页 Engineering and Technological Research
关键词 地基加固 槽壁 高压旋喷 压密注浆 盾构施工 foundation reinforcement groove wall high pressure rotary jet compaction grouting shield construction
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部