摘要
以上海轨道交通7号线新旧综合监控系统的割接升级工程为研究探索对象,通过分析用户需求,合理利用现有条件,确保了在不停运、不影响既有线路运营的情况下,高效、安全、稳定地完成割接升级改造工作,为在运营线路综合监控系统提供了一套边运营边割接升级的方案。上海轨道交通7号线新旧综合监控系统割接升级的成功经验可为其他城市轨道交通线路的综合监控系统割接升级改造提供借鉴。
Taking the cutover upgrading project of the new and old integrated monitoring systems of Shanghai Metro Line 7 as the research and exploration object,by analyzing user needs and making reasonable use of existing conditions,it ensured the efficient,safe,and stable completion of the cutover upgrading and renovation work without stopping operation and affecting the operation of existing lines,which provided a set of solutions for cutover upgrading of the integrated monitoring systems of operating lines while operating.The successful experience of cutover upgrading of the new and old integrated monitoring systems of Shanghai Metro Line 7 can provide reference for the cutover upgrading and renovation of integrated monitoring systems of other urban rail transit lines.
作者
张宁
Zhang Ning(Shanghai Electrical Automation Design&Research Institute Co.,Ltd.,Shanghai 200023,China)
出处
《电气自动化》
2024年第5期114-115,共2页
Electrical Automation
关键词
轨道交通
综合监控
割接升级
rail transit
comprehensive monitoring
cutover upgrading