摘要
针对当前深基坑支护建设工程工期长、效率低的问题,提出了采用三轴搅拌桩施工工艺来进行支护桩的建造,同时,针对深基坑支护建设工程进行了监测方案的研究。通过提出方法建造的支护桩整体稳定性系数为2.375,大于相关规范规定的1.35。
In view of the problems of long duration and low efficiency of the current deep foundation pit supporting construction project,the three-axis mixing pile construction technology is put forward to build the supporting pile,and the monitoring scheme is studied for the deep foundation pit supporting construction project.The overall stability coefficient of the supporting pile constructed by the proposed method is 2.375,which is greater than 1.35 stipulated by the relevant standards.
作者
张剑林
王非
许圆昌
田宇
刘新悦
ZHANG Jian-lin;WANG Fei;XU Yuan-chang;TIAN Yu;LIU Xin-yue(The Third Construction Engineering Company Ltd.of China Construction Second Engineering Bureau,Beijing 100070,China)
出处
《工程建设与设计》
2024年第18期16-18,共3页
Construction & Design for Engineering
关键词
地下停车场
深基坑
支护结构设计
施工监测
underground parking lot
deep foundation pit
support structure design
construction monitoring