摘要
详细探讨了义乌晶澳项目中洁净厂房空调系统的安装技术,重点分析了洁净厂房的洁净度要求,并系统阐述了空调系统安装的全过程,包括安装前的准备工作、通风管道安装、水管道安装、设备机房施工、暖通工程、新风量控制空调系统调试。
This paper discusses the installation technology of air conditioning system of clean workshop in Yiwu Jing’ao Project in detail,focuses on analyzing the cleanliness requirements of clean workshop,and systematically describes the whole process of air conditioning system installation,including pre-installation preparation,ventilation pipe installation,water pipe installation,equipment room construction,HVAC engineering,and commissioning of fresh air volume control air conditioning system.
作者
王殿玉
WANG Dian-yu(China Electronics System Engineering No.2 Construction Co.Ltd.,Wuxi 214142,China)
出处
《工程建设与设计》
2024年第18期116-118,共3页
Construction & Design for Engineering
关键词
洁净厂房
空调系统安装
洁净度
新风量控制
义乌晶澳项目
clean workshop
air conditioning system installation
cleanliness
fresh air volume control
Yiwu Jing’ao Project