摘要
介绍了塔式起重机附墙的基本作用和相关名词的解释,阐述了附着装置的设计标准,通过模型演算塔式起重机临时锚固时吊臂的受力状况,并通过演算结果得出正确的锚固方法,以指导塔式起重机采取正确合适的锚固措施。
This paper introduces the basic function of tower crane wall attachment and the explanation of related terms,expounds the design standard of attachment device,calculates the stress condition of the boom during temporary anchoring of tower crane through model calculation,and obtains the correct anchoring method through calculation results,so as to guide tower crane to take correct and appropriate anchoring measures.
作者
陈向平
王俊国
成磊
陈镜宇
姜正寿
CHEN Xiang-ping;WANG Jun-guo;CHENG Lei;CHEN Jing-yu;JIANG Zheng-shou(China Construction Second Engineering Bureau Co.Ltd.,South China Company,Shenzhen 518000,China;China Construction Second Bureau Shenzhen South Construction Investment Co.Ltd.,Shenzhen 518000,China)
出处
《工程建设与设计》
2024年第18期176-178,共3页
Construction & Design for Engineering
关键词
塔式起重机
附墙
临时锚固
方法
tower crane
attached wall
temporary anchorage
method