摘要 现阶段装配式剪力墙多采用灌浆套筒连接,施工过程中易出现灌浆不密实等缺陷。为避免潜在的灌浆缺陷,提出了一种预留后浇区竖向钢筋采用锥套紧锁连接的装配式剪力墙,并开展抗震性能研究。分别对两片剪力墙进行了轴压比为0.1的拟静力试验,其中一片剪力墙为现浇,另一片为预留后浇区竖向钢筋采用锥套紧锁连接的装配式剪力墙。试验发现,现浇剪力墙和锥套紧锁连接的装配式剪力墙试件,在位移角分别达到1/40和1/50时,试件荷载降至峰值荷载的85%以下,前者下部两侧角部墙体混凝土被压溃,后者左侧后浇区竖向钢筋被拉断,且前者的延性比后者高22%,初期刚度后者比前者高20%。此外,两试件破坏形态基本相同,均发生弯剪破坏,滞回性能和耗能能力基本一致。 At present,prefabricated concrete shear walls are mostly connected by grouting sleeves,which can lead to defects such as loose grouting during construction.To avoid potential grouting defects,a prefabricated shear wall with vertical steel bars connected by prestressed cone-sleeve in reserved post cast area is proposed,and seismic performance research was carried out.Quasi-static tests were conducted on two concrete shear walls with an axial compression ratio of 0.1.One shear wall was cast-in-place,and the other was a prefabricated shear wall with prestressed cone-sleeve connections.The experiment found that when the drift ratio of the cast-in-place shear wall and the prefabricated shear wall were 1/40 and 1/50,respectively,the load of the specimens decreased to less than 85%of the peak load.The concrete on the lower corner wall of the cast-in-place shear wall was crushed,and the vertical steel bars in the left post-cast area of the prefabricated shear wall were pulled off.The ductility of the former was 22%higher than that of the latter,and the initial stiffness of the latter was 20%higher than that of the former.In addition,the failure modes of the two shear walls were basically the same,both of which underwent bending and shear failure,and the hysteresis performance and energy dissipation capacity were basically the same.
作者 夏云 刘洧骥 陈春涛 周谢忠 唐红元 谈鸿霏 XIA Yun;LIU Weiji;CHEN Chuntao;ZHOU Xiezhong;TANG Hongyuan;TAN Hongfei(China Power Construction Chengdu Construction Industrialization Co.,Ltd.,Chengdu 610400,China;School of Civil Engineering,Sichuan University of Science and Engineering,Zigong 643002,China)
出处 《工业建筑》 2024年第9期81-89,共9页 Industrial Construction
关键词 锥套紧锁连接 装配式剪力墙 抗震性能 拟静力试验 滞回性能 prestressed cone sleeve connection prefabricated concrete shear wall seismic performance quasi-static test hysteretic behavior
  • 相关文献

参考文献6

二级参考文献35

  • 1周剑,赵作周,侯建群,任宝双,初明进,刘继良.预制混凝土空心模剪力墙上下层插筋连接抗震性能试验研究[J].建筑结构学报,2015,36(6):44-52. 被引量:16
  • 2尹之潜,朱玉莲,杨淑文,李树桢,刘岩.高层装配式大板结构模拟地震试验[J].土木工程学报,1996,29(3):57-64. 被引量:18
  • 3GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 4JG儿01-96建筑抗震试验方法规程[s].北京:中国建筑工业出版社,1996.
  • 5.GB50010-2002混凝土结构设计规范[S].北京:中国建筑工业出版社,2002..
  • 6JGJ101-96建筑抗震试验方法规程[S].北京:中国建筑工业出版社,1996.
  • 7JGJ101-1996建筑抗震试验方法规程[S].北京中国建筑工业出版社,1997.
  • 8JGJ1-2014装配式混凝土结构技术规程[s].北京:中国建筑工业出版社,2014.
  • 9Federation International for Structural Concrete. Bulletin 43:structural connections for precast concrete buildings [ R ]. Stuttgart : Sprint-Digital-Druek, 2008 : 222 -229.
  • 10JGJ355-2015钢筋套筒灌浆连接应用技术规程[S].北京:中国建筑工业出版社,2015.

共引文献296

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部