摘要
本文深入分析了钻孔灌注桩施工过程中的主要质量控制要点并提出了多项有效的控制措施和优化策略,重点探讨了施工前的准备工作、施工过程中的技术要点以及施工后的质量检测方法,通过这些系统的质量控制措施,为提高市政工程中钻孔灌注桩的施工质量提供了理论依据和实践指导。
This paper deeply analyzes the main quality control points in the construction process of bored pile and puts forward a number of effective control measures and optimization strategies,focusing on the preparation work before construction,the technical points in the construction process and the quality detection methods after construction.It provides theoretical basis and practical guidance for improving the construction quality of bored pile in municipal engineering.
作者
陈明瑄
CHEN Ming-xuan(Fujian Chuangyi Engineering Management Co.,Ltd.Fuzhou 350000,China)
出处
《全面腐蚀控制》
2024年第10期48-50,共3页
Total Corrosion Control
关键词
市政工程
钻孔灌注桩
施工质量控制
技术要点
质量检测
municipal engineering
bored pile
construction quality control
technical points
quality inspection