摘要
旨在探讨在高水位及卵石地质条件下采用抗浮技术的原因。通过对比分析论证选择适用于工程项目的抗浮技术(方案),同时确定抗浮锚杆的技术参数,并对抗浮锚杆的施工工艺、施工过程质量控制、施工重难点及抗浮技术运用效果进行深入探讨。抗浮技术(方案)最终取得的效果:加快了施工进度、缩短了施工工期、节约了施工成本、预设定的抗浮锚杆技术参数符合工程抗浮要求。抗浮锚杆技术(方案)在文体中心项目成功运用,可为以后类似工程施工提供借鉴。
This article studies the reason for adopting Anti-Floating technology under high water level and pebble geological conditions.Through comparative analysis and demonstration,the Anti-Floating technology(scheme)suitable for the project is selected,and the technical parameters of the anti-floating anchor are determined.The construction technology of anti-floating anchor,the quality control of construction process,the key and difficult points of construction and the application effect of Anti-Floating technology are discussed in depth.The final re-sults of the Anti-Floating technology(scheme)are as follows:The construction progress is accelerated,the construc-tion period is shortened,the construction cost is saved,and the preset technical parameters of the anti-floating an-chor meet the anti-floating requirements of the project.The successful application of Anti-Floating Anchor tech-nology(scheme)in the sports center project can provide reference for the construction of similar projects in the fu-ture.
作者
岑知达
CEN Zhida(China Energy Engineering Group Guangxi Hydroelectric Construction Bureau Co.,Ltd.,Nanning,Guangxi Zhuang Autonomous Region,530001 China)
出处
《科技资讯》
2024年第18期118-123,共6页
Science & Technology Information
关键词
抗浮锚杆
锚杆技术
高水位
卵石地质
Anti-floating anchor
Anchor technology
High water level
Pebble geology