期刊文献+

装配式多层工业厂房施工关键技术研究

Study on Key Construction Techniques of Fabricated Multi-storey Industrial Building
下载PDF
导出
摘要 为了确保装配式厂房的施工质量,依托上海联东U谷·海隆生命健康谷(一期)厂房项目具体施工案例,对装配式多层厂房施工中的技术重难点展开研究,分别从构件设计、漏浆、碰撞、特殊节点处施工4个方面进行梳理,提出了针对性解决措施,节约了项目成本、提升了施工质量,可为同类项目提供参考。 To ensure the construction quality of prefabricated plants,the specific construction case of the Shanghai Liandong U Valley·Hilong Life and Health Valley(Phase I)plant project is used as a basis to study the key and difficult technical points in the construction of prefabricated multi-storey plants.These technical points are analyzed in four aspects:component design,leakage,collision,and construction of special nodes.Targeted solutions are proposed to save project costs and improve construction quality.The findings can provide a reference for similar projects.
作者 侯义芬 邵志兵 叶文启 HOU Yifen;SHAO Zhibing;YE Wenqi(Zhongtian Construction Group Co.,Ltd.,Shanghai 201102,China)
出处 《建筑施工》 2024年第10期1701-1705,共5页 Building Construction
基金 中天建设集团研发课题(ZTZY-03-2024-01)。
关键词 装配式多层厂房 构件设计 漏浆 节点优化 prefabricated plant multi-storey factory building component design leakage node optimization
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部