某车企大型工程改造项目敏捷实施方法研究

Research on Agile Implementation Method of Large-scale Engineering Reconstruction Project in an Automotive Enterprise
下载PDF
导出
摘要 针对大型工程改造项目采用传统项目管理方法产生的工期评估过于粗放、需求时间过长、对变化响应不及时的问题,可采用敏捷管理思想,通过精细划分施工网格获取最乐观工序时间,精准评估工期需求。文章阐述了项目敏捷实施方法,应用柔性设备方案、3D扫描技术、基于BIM技术的进度管理、虚拟调试技术等,并充分利用正式停产前的碎片化停工时间组织施工,以缩短施工准备和停产需求时间,可为大型工程改造项目提供敏捷实施方法,为类似项目敏捷、高效、精益实施提供参考。 In view of the problems of too extensive construction period assessment,too long demand time and untimely response to changes caused by traditional project management methods in large-scale engineering reconstruction projects,agile management ideas can be adopted to obtain the most optimistic procedure time through fine division of construction grids to accurately evaluate the construction period requirements.This paper expounds the agile implementation method of the project,applies flexible equipment scheme,3D scanning technology,schedule management based on BIM technology,virtual debugging technology,etc.,and makes full use of the fragmented shutdown time before formal stop production time to organize construction,so as to shorten the construction preparation and stop production demand time.It can provide an agile implementation method for large-scale engineering reconstruction projects,and provide a reference for the agile,efficient and lean Research on Agile Implementation Method of Large-scale Engineering Reconstruction Project in an Automotive Enterprise implementation of similar projects.
作者 胡际勇 刘杰军 何嘉棠 张伟龙 林万里 HU Jiyong;LIU Jiejun;HE Jiatang;ZHANG Weilong;LIN Wanli(FAW-Volkswagen Automotive Co.,Ltd.,Changchun 130011,Jilin,China)
出处 《工程技术研究》 2024年第15期150-152,共3页 Engineering and Technological Research
关键词 大型改造项目 敏捷管理 施工组织 工期优化 large-scale reconstruction project agile management construction organization construction period optimization
  • 相关文献

参考文献5

二级参考文献23

共引文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部