4Layden John. The Evolution of Scheduling Logic[J]. APS, August 1998,23-25.
5Mason Richard, McKenney James, Carlson Walter, Copeland Duncan. Absolutel y, Positively Operations Research: The Federal Express Story[R]. Interfaces 19 97,27(3-4).
6Follow-Up. Fortune Magazine[J]. 1984,3(5).
7Goldratt E M, Cox J. The Goal: A Process of Ongoing Improvement, 2nd rev. ed. Great Barrington[M]. MA:North River Press, 1992.
8Bishop Jerry E. AT&T Maintains Secrecy on Details In Touting Problem-Sol ving Inventions[J]. The Wall Street Journal, 1984,11(26).
9Fordyce Kenneth, Sullivan Gerald. Logistic Management Systems(LMS):Integ rating Decision Technologies for Dispatch Scheduling in Semiconductor Manufactur ing[M]. Chapter 17 in Intelligent Scheduling edited by Monte Zweben and Mark S . Fox, Morgan Kaufman Publishing, 1994.
10Faccenda Joe, Rowan Duncan A. Expert Systems[A]. Chapter 8 in Planning , Scheduling, and Control Integration in the Process Industries, Edited by C.Edw ard Bodington[M]. McGraw Hill Incorporated, 1995.