8N Boysen, M Fliedner, A Seholl. Sequencing mixed- model as- sembly lines: Survey, classification and model critique[J]. Euro- pean Journal of Operational Research, 2009,192 ( 2 ) :349 - 373.
9S G Ponnambalam, N Jawahar, P Aravindan. A simulated annea- ling algorithm for job shop scheduling[ J ]. Production Planning & Control, 2010,10 ( 8 ) :767 - 777.