期刊文献+

水厂双电源改造项目的设计依据及应用

Design Basis and Application Analysis of Dual Power Supply Transformation Project for Water Plant
下载PDF
导出
摘要 文章针对某水厂的双电源改造项目,详细分析了其设计依据及应用效果。随着供水需求的增加和对供电安全保障要求的提高,现有单回路供电系统无法满足水厂的运行需要,存在较大的安全隐患和供电不足的问题。通过对3种改造方案的对比分析,最终选择了方案1。该方案不仅投资少、施工难度低,而且能够有效提升供电的可靠性和安全性。项目实施后将显著改善水厂的供电稳定性,确保供水安全,提升经济效益和社会声誉。文章提供了详细的实施计划和预期回报分析,可为类似项目的设计和实施提供参考和借鉴。 This article analyzes in detail the design basis and application effect of a dual power supply renovation project for a certain water plant.With the increasing demand for water supply and the higher requirements for power supply safety,the existing single circuit power supply system cannot meet the operational needs of water plants,and there are significant safety hazards and power supply shortages.This article compares and analyzes three renovation plans,and ultimately chooses Plan 1.This plan not only has less investment and lower construction difficulty,but also effectively improves the reliability and safety of power supply.After the implementation of the project,it will significantly improve the power supply stability of the water plant,ensure water supply safety,enhance economic benefits and social reputation.The article revolves around the main argument and provides a detailed implementation plan and expected return analysis,providing reference and inspiration for the design and implementation of similar projects.
作者 谭兆景 TAN Zhaojing
出处 《电力系统装备》 2024年第9期72-74,共3页 Electric Power System Equipment
关键词 双电源改造 供电安全 方案对比 供水厂 工程实施 dual power supply transformation power supply safety scheme comparison water supply plant engineering implementation
  • 相关文献

参考文献4

二级参考文献14

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部