以频繁启停调峰9FA燃气机组为例,从技术和经济角度分析纯凝发电9FA联合循环机组通过系统改造实施对外集中供热可行性,对抽汽成本进行测算,对同类型纯凝发电机组的潜在供热机会具有一定的参考作用。
Taking frequent start/stop and peak shaving of 9FA gas units as an example,this paper analyzes from technical and economic perspectives the feasibility of providing external centralized heating through system retrofit of pure condensing generator 9FA combined cycle units.The steam extraction cost is calculated,which has a certain reference value for potential heating opportunities of similar pure condensing generator units.
作者
陆亮亮
LU Liangliang(State Energy Group Hainan Electric Power Co.,Ltd.,Haikou 570100,China)
出处
《电工技术》
2024年第17期152-154,共3页
Electric Engineering
关键词
9FA燃气机组
抽汽供热
成本
可行性
9FA gas unit
steam extraction heating
cost
feasibility analysis