期刊文献+

BIM+AR在烟台港西港区液化天然气项目配套码头工程中的应用

Application of BIM+AR in supporting terminal engineering of liquefied natural gas project in west port area of Yantai port
下载PDF
导出
摘要 随着工程建设领域对于数字化、信息化的要求不断提高,针对当前BIM(建筑信息模型)应用过程中存在的与现场结合度低,各阶段信息中断等问题,借助AR(增强现实)技术具有的在真实场景叠加模型的功能,以烟台港西港区液化天然气(LNG)项目配套码头工程为例,搭建项目BIM+AR可视化管理平台。在搭建项目电子沙盘并开展BIM基础应用基础上,探究BIM+AR技术在高桩码头应用优势,通过建成模拟、施工交底、校核比对、管控进度等的综合应用,可有效提高施工效率与施工精细化管理水平。 With the continuous improvement of the requirements for digitization and informatization in the field of engineering construction,in view of the problems existing in the application process of BIM(building information model),such as low integration with the site and information interruption at various stages,AR(augmented reality)technology has the function of superimposing models in real scenes.The project BIM+AR visual management platform is built by taking the supporting wharf project of Yantai Port west port area liquefied natural gas(LNG)project as an example.On the basis of building the project electronic sand table and carrying out the basic application of BIM,the application advantages of BIM+AR technology in high pile wharf are explored.Through the comprehensive application of completion simulation,construction guidance,verification and comparison,and progress control etc.It can effectively improve the construction efficiency and fine management level of construction.
作者 田会静 明亮 李桐林 王艾超 郭红旗 代鹏飞 TIAN Huijing;MING Liang;LI Tonglin;WANG Aichao;GUO Hongqi;DAI Pengfei(CCCC(Tianjin)Eco-Environmental Protection Design&Research Institute Co.,Ltd.,Tianjin 300461,China;CCCC(Tianjin)Dredging Engineering Co.,Ltd.,Tianjin 300450,China)
出处 《水运工程》 2024年第9期204-208,共5页 Port & Waterway Engineering
关键词 高桩码头 BIM技术 AR技术 high piled wharf BIM technology AR technology
  • 相关文献

参考文献3

二级参考文献19

  • 1Webster A, Feiner S, Macintyre B, et al. Augmented reality in architectural construction, inspection and renovation [ C ]//Prec. ASCE Third Congress on Computing in Civil Engineering. 1996: 913-919.
  • 2Wang X, Dunston P S. Potential of augmented reality as an assistant viewer for computer-aided drawing [ J ]. Journal of Computing in Civil Engineering, 2006, 20(6) : 437-441.
  • 3Bebzadan A H, Kboury H M, Kamat V R. Structure of an extensible augmented reality framework for visualization of simulated construction processes [ C ]//Simulatlon Conference, 2006. WSC 06. Proceedings of the Winter. IEEE, 2006 : 2055- 2062.
  • 4Dtinser A, Grasset R, Billinghurst M. A survey of evaluation techniques used in augmented reality studies[M]. New Zealand: Human Interface Technology Laboratory, 2008.
  • 5Wang X, Kim M J, Love P E D, et al. Augmented reality in built environment: classification and implications for future research [ J ]. Automation in Construction, 2013 (32) : 1-13.
  • 6Hart S G, Staveland L E. Development of NASA-TLX (task load index): results of empirical and theoretical research [ J ]. Advances in Psychology, 1988(52) : 139-183.
  • 7杨洪明.高桩码头预制构件施工质量控制[J].中国水运(下半月),2013,13(9):299-300. 被引量:5
  • 8赵峰.港口码头建设中几个细节问题的探析[J].中国水运(下半月),2014,14(10):271-272. 被引量:2
  • 9廖苏理,宋叶青.高桩码头桩基施工技术研究[J].知识经济,2014(24):80-80. 被引量:2
  • 10曾凝霜,刘琰,徐波.基于BIM的智慧工地管理体系框架研究[J].施工技术,2015,44(10):96-100. 被引量:143

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部