摘要
综放工作面在过穿层老巷期间,如果没有有效的顶板管理措施,容易造成老巷冒顶,从而导致工作面无法正常回采。该文主要对综放工作面过穿层巷道的技术、方法进行了研究,解决了穿层巷道区域煤层开采期间的顶板管理问题,对相似工作面的开采具有借鉴意义。
If there are no effective roof management measures during the period of passing through the old roadway in the fully mechanized mining face,it is easy to cause the roof of the old roadway to collapse,resulting in the inability of the working face to recover normally.This paper mainly studies the technology and method of the roadway in the fully mechanized top coal caving face,which solves the problem of roof management during the coal seam mining in the area of roadway,and has reference significance for the mining of similar working faces.
作者
刘同军
LIU Tong-jun(Chaili Coal Mine,Zaozhuang Mining Group,Tengzhou 277519,China)
出处
《价值工程》
2024年第30期62-64,共3页
Value Engineering
关键词
穿层老巷
冒顶
区域煤层
开采
crossing layer old lane
roof fall
regional coal seams
exploitation