变电站日常运维中,在固定的维护周期内,需要在不同电源之间切换,以确保双电源的可使用性、安全性以及完整性。虽然是双电源,但是在2种电源来回切换之间还是存在短暂的断电。文章结合现场实际进行分析,研究变电站交直流轮换试验不间断电源装置,设计供电旁路,有效避免变电站交直流系统轮换过程中出现间接性停电与设备冲击,同时设置完善电气闭锁逻辑,避免误操作导致的电源短路合环事故。
In the daily operation and maintenance of the substation,it is necessary to switch between different power sources within a fixed maintenance cycle to ensure the usability,safety and integrity of dual power sources.Although it is a dual power supply,there is still a brief power outage when switching back and forth between the two power supplies.Therefore,strictly speaking,the reliability of dual power sources is significantly enhanced compared to single power sources,but there is still a problem of intermittent power outages.we accord the actual situation on site to study the AC/DC alternating test uninterrusted power supply device in the substation,design a power supply bypass to effectively avoid indirect power outages and equipment impacts during the rotation experiment of the AC/DC system in the substation.At the same time,a complete electrical locking logic is set up to avoid power short circuit closing accidents caused by misoperation。
作者
王辉煌
张俊康
陈祥坚
叶华
王志春
WANG Huihuang;ZHANG Junkang;CHEN Xiangjian;YE Hua;WANG Zhichun(State Grid Fujian Power Co.,Ltd.Quanzhou Power Supply Company,Fujian Quanzhou 362000,China)
出处
《农村电气化》
2024年第10期81-84,共4页
Rural Electrification
关键词
变电站
轮换试验
不间断电源
电气防误