计及新能源场站黑启动时空支撑能力的分区目标网架优化

Optimization of Power System Black Start partition Target Network Taking into Account the Black Start Space-Time Support Capability of New Energy Station
下载PDF
导出
摘要 为提升新型电力系统的非常规安全防御能力,提出了计及新能源场站黑启动时空支撑能力的分区目标网架优化方法。首先,基于新能源场站黑启动时空支撑能力定义了扩展黑启动电源;其次,以最小化分区内电气距离之和和分区间联络线数目为优化目标,将扩展黑启动电源转化为分区数量约束,并同时计及功率平衡、分区连通性、灵活性资源等约束,建立了计及扩展黑启动电源的分区目标网架整数线性规划模型;最后通过仿真系统验证了所提方法有助于新能源场站黑启动分区恢复决策。 Taking into account the spatiotemporal support capacity of new energy station black start,a target network optimization method for power system black-start zoning is proposed to improve unconventional security defense ability of the new power system.Firstly,extended black-start power source(EBSPS)is defined based on the concept of spatiotemporal support capability for black start of new energy stations.Secondly,with the optimization objectives of minimizing electrical distance within the partition and the number of interconnections between partitions,an integer linear programming model for partition target network that takes into account EBSPS is established,in which EBSPS is transformed into a constraint on the number of partitions and other constraints such as power balance,partition connectivity,and flexibility resources are considered as well.Finally,the proposed method was validated through a simulation system to aid in the decision-making process for restoring black start zones in new energy stations.
作者 王瑞欣 孙吉广 刘艳 程伦 许婷 孙广辉 WANG Ruixin;SUN Jiguang;LIU Yan;CHENG Lun;XU Ting;SUN Guanghui(State Grid Hebei Electric Power Co.,Ltd.,Shijiazhuang 050021,China;School of Electrical and Electronic Engineering,North China Electric Power University,Baoding 071003,China)
出处 《中国电力》 CSCD 北大核心 2024年第10期143-149,共7页 Electric Power
基金 国家自然科学基金(联合基金)资助项目(U22B2099) 国网河北省电力有限公司科技项目(5204BB220003)。
关键词 新能源场站 黑启动时空支撑能力 黑启动分区 new energy station black-start space-time support capacity black start partition