摘要
在城市中输电线路密集,尤其是架空的高压线路位于施工项目区域时,高压线下安全实施钻孔灌注桩、三轴水泥搅拌桩等内容时,涉及旋挖钻、磨盘钻、起重机等作业器械,会出现在高压线下施工的情况,需采取一定的安全及防护措施,以确保高压线下的施工安全。
There are dense transmission lines in the city.When implementing drilling and grouting piles,threeaxis cement mixing piles,it involves operating equipment such as rotary drills,disc drills,and cranes.When overhead high-voltage power lines are located in the construction project area,there may be construction under the high-voltage lines,and certain safety and protective measures need to be taken to ensure the safety of construction under the high-voltage lines.
作者
王文凯
龙慧梅
马莉
WANG Wenkai;LONG Huimei;MA Li(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处
《云南水力发电》
2024年第10期125-128,共4页
Yunnan Water Power
关键词
220
kV
高压铁塔
深大基坑
技术措施
220 kV
high voltage iron tower
deep foundation pit
technical measure