摘要
某污水处理厂水土保持措施根据水土保持工程设计原则,结合项目建设内容、工程布局、施工工艺、水土流失特点和项目区地形地貌,对不同分区采取不同的具体防护。通过对主体水土保持工程界定、分析、评价,将主体工程设计的表土剥离、覆土整治、表土临时防护及施工道路临时排水等措施纳入水土保持方案防治措施体系,并与新增防治措施有机结合,形成完整的水土保持综合防治体系。
According to the design principles of soil and water conservation engineering,the soil and water conservation measures of the sewage treatment plant are designed based on the construction content,engineering layout,construction technology,soil erosion characteristics,and topography of the project area,and specific protection measures are adopted for different zones.Through the definition,analysis and evaluation of the main soil and water conservation project,the designed measures such as topsoil stripping,soil covering,temporary protection of topsoil and temporary drainage of construction roads are incorporated into the prevention and control system of the soil and water conservation program,that is combined with the new prevention and control measures to form a complete comprehensive prevention and control system of soil and water conservation.
作者
曹艳玲
CAO Yanling(Shangqiu River and Lake Affairs Center,Shangqiu 476000,China)
出处
《河南水利与南水北调》
2024年第9期8-9,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
水土保持
表土剥离
覆土整治
水土流失
soil and water conservation
topsoil stripping
soil covering
soil erosion