摘要
某物流枢纽基地项目具有水土保持功能并纳入水土保持方案的措施有:物流仓储区的临时苫盖;道路工程的临时苫盖、雨水管网和绿化;施工生活区的临时苫盖;临时堆土防治区的临时苫盖、临时拦挡和表土防护等水土保持措施。根据《生产建设项目水土保持技术标准》(GB50433-2018),某物流枢纽基地项目主体设计水土保持措施能有效防治水土流失,但缺少物流仓储区的表土剥离。新增有道路工程的表土剥离、土地整治、临时排水沟、临时沉沙池;临时堆土区的临时苫盖、临时拦挡和表土防护等水土保持措施。主体设计措施与新增措施两者有机结合形成完整的水土保持综合防治体系。
The logistics hub base project has soil and water conservation functions and the measures in the soil and water conservation program include temporary cover of logistics storage area,storm water networks and greening for road works,temporary cover for living quarters,temporary cover and barriers for topsoil protection in temporary soil dump area,etc..According to the Technical Standards for Soil and Water Conservation of Production and Construction Projects(GB50433-2018),the soil and water conservation measures designed for the main body of the logistics hub base project can effectively prevent and control soil erosion,but lacks the measures for topsoil stripping in the logistics and storage area,the measures for topsoil stripping,land consolidation,temporary drainage ditches,and temporary silting tanks,temporary covers and barriers for topsoil protection in temporary soil dump area in new road construction.Integrating the soil and water conservation measures in the main project design and the new soil and water conservation measures could form a complete comprehensive prevention and control system for soil and water conservation.
作者
赵秀民
ZHAO Xiumin(Henan Provincial Hydrology and Water Resources Center,Zhengzhou 450003,China)
出处
《河南水利与南水北调》
2024年第9期10-11,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
水土保持
临时苫盖
水土流失
工程措施
soil and water conservation
temporary covering
soil erosion
engineering measures