暗挖隧道下穿既有铁路站场实施方案设计

Implementation Plan Design for Mined TunnelCrosses under Existing Railway Yard
下载PDF
导出
摘要 以重庆市九龙坡区市政隧道下穿铁路站场为依托,通过数值模拟与现场实测相结合的方法,按实际情况,对下穿暗挖隧道过站区施工过程进行模拟,对下穿隧道施工过程中引起既有铁路站场变形及控制措施开展研究,对既有铁路变形进行评价,得出适用于该工程地质的控制措施,使新建隧道在保证铁路正常运营及安全下,下穿既有铁路站场。 Based on the underpass railway yard of a tunnel project in Jiulongpo District in Chongqing,this paper simulates the excavation process of the underpass area according to the actual excavation sequence and construction technology through the combination of numerical simulation and field measurement.From the perspective of construction mechanics mechanism analysis,the deformation and control measures caused by the existing railway yard during the construction of the underpass tunnel are studied.By evaluating the deformation of the existing railway,the control measures suitable for the engineering geology are obtained,so that the new tunnel can pass through the existing railway yard under the guarantee of the normal operation and safety of the railway.
作者 李星 龚贵友 张轩铭 唐文洋 张丛 LI Xing;GONG Guiyou;ZHANG Xuanming;TANG Wenyang;ZHANG Cong(CISDI Urban Construction(Chongqing)Co.,Ltd.,Chongqing 401122,China;CMCU Engineering Co.,Ltd.,Chongqing 400041,China)
出处 《黑龙江交通科技》 2024年第10期111-115,共5页 Communications Science and Technology Heilongjiang
关键词 暗挖隧道 铁路 下穿施工 加固措施 mined tunnel railways crossing construction reinforcement measure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部